Services

Six services, from site to operation

Site origination

We find the land, check grid headroom and agree an option with the owner.

Consent, planning

Ecology, noise, landscape and community consultation, taken through to determination.

Grid connection

Application, offer negotiation and the compliance studies the operator wants.

Engineering design

Yield modelling, layout, electrical and civil design, as a construction-ready package.

Construction build

Groundworks, mounting, modules or turbines, cabling, substation and commissioning.

Operations

Remote monitoring, planned maintenance, fault response and the annual lender report.

Most owners arrive with two or three of these already done

You may already hold the land, or a connection offer, or a consent that has gone stale. We will tell you which of the six you really need and which you should keep in-house, before anyone signs a thing. If the site will not work, we say so in week one.

Grid, then land

We test the network before the land option

One fixed price

We carry the programme risk, not the owner

Models lenders take

Yield within two per cent on every live site

We own our sites

Sixty-eight sites still on our own books

1400

Megawatt

Built and energised

Across solar, wind and storage

68

Sites

Under our operation

Several past their fifteenth year

22

Years

Developing renewables

Since the first site back in 2003

410

People

Engineers, planners

Across four country offices